Capability list
Eighteen areas, all optional, all per event. This is the honest list — what is built and shipping, not a roadmap. Jump to what you care about.
01 — People
The single most important idea in the whole system: a person exists once, not once per event. Invite them to the New Year thing and their history, karma, photo and partner come with them.

02 — Invitations & RSVP
Every guest gets a personal link. Tapping it logs them in, forever, on any device. The number-one reason people don't RSVP is friction, and this removes all of it.
Before there's even a date
The one question that genuinely comes before the invitation is which weekend suits you, and it usually gets asked in a group chat that nobody can read back. Put two or three dates up instead. Every guest answers yes, maybe or no against each, from their own page, one tap per date. You get a grid of people, not a bar chart — because who can do the 12th is the actual question — with the best column marked.

03 — Open signups
Some parties aren't an invitation list. A supper club, a retreat, a paid weekend — you post it, people put their names down, and you decide who's in. Switch a party to signup mode and it grows a public front door without stopping being the same party underneath. Or go one simpler: make it a link, paste it into the group chat, and whoever opens it is on the list.
We are not a ticketing platform. We don't take payments, issue tickets or scan them on the door — and we're not trying to. What we do is everything that happens around a paid event, which is the part ticketing platforms leave you to do in a spreadsheet.
Your party gets a permanent public link with its own promo page — your poster, your backdrop, your fonts, your sell copy down the side. It's in your party's theme, pre-built world and all, because it's a real page of the site rather than a form on a grey box.
Name and email required, mobile and a message optional. Every signup lands in a review queue on your console — and gets your how-to-pay details on the page and by email, the moment they've asked.
One button turns a signup into a guest, RSVP'd Coming — because paid means coming. From then on they're an ordinary guest with the whole dashboard, the badges and the karma.

Then keep selling them there. Sell through whichever platform you already use, export the attendee list when you're ready, and bring it in — CSV import matches people you've had before rather than duplicating them, so a regular arrives with their history, their karma and their photo intact.
From that moment they're ordinary guests: they get the dashboard, the info page, the schedule, the jobs board, the beds, the badges and the party AI. This model works really well — the ticketing platform does the selling, and everything it hands you afterwards happens here.
No card processing, no ticket issuing, no QR codes, no scanners, no refunds, no payouts, no fees taken off the top. Money never touches us and we never hold any of yours.
If you use signup mode, you tell people how to pay — bank transfer, your own payment link, cash on the night — and confirm them once it lands. Nothing to reconcile with us, and no percentage.
Running a paid event and not sure how it would fit? Ask us — [email protected]. It's a model we know well and we'll tell you straight if it isn't a fit.
04 — Communications
Email for the invitation people forward to their partner. WhatsApp for the nudge people actually read. SMS for the guests — and the countries — where WhatsApp isn't the thing people open. All templated per event, all tracked per guest, all behind one guest-list lock.




--- line in a template splits it into separate sequential messages, so long copy never collapses behind WhatsApp's "Read more".05 — The guest dashboard
A ticket with their name on it, a countdown, their karma, and a tile grid to everything the party has going on. It changes as the party gets closer, and changes again once it's over.
yourparty.party/info, /parking, /menu — which is a link you can say out loud.06 — Badges & karma
Points and trophies sound trivial until you watch someone screenshot their leaderboard position and post it in the group chat eleven months before the next party.


07 — Games
08 — The room

09 — Jobs & Backstage
A board of everything that needs doing — before the party, on the night, and the morning after — with a leader and a crew per job, and a production desk behind it. Guests claim what they fancy from their own dashboard; you stop being the only person who knows the marquee needs collecting.


10 — Getting there
Your guests know where the party is. What they don't know is that two of them are on the same flight, that one is driving past another's front door with three empty seats, or that five of them get into the same airport inside ninety minutes. They work it out in a group chat, badly, and you find out on the Monday that two of them booked separate cars from the same terminal forty minutes apart.

11 — Where they sleep
Any party where people stay over turns into the same shared spreadsheet, and the spreadsheet cannot count. List what you've got — rooms, beds, tents, pitches, the good sofa — and put people in it night by night. Guests see where they're sleeping and who they're sharing with, and can ask for what's still free.

12 — Feeding them
Any party longer than an evening has to feed people, and the three things you need are never in the same place: how many are eating, whether there's enough, and who sits with whom. Lay out the sittings and the head count comes off the guest list itself — then lay out the room and the seating plan does the same.


13 — What else is on
The clay pigeon shooting, the sauna hour, the boat trip, the quad bikes, the Saturday club night. A running order can say 14:00 clay shooting; it cannot say there are twelve places, eight are taken, what it costs, who has paid, and that it doesn't run below six. Those are the four things that turn a line on a schedule into a WhatsApp thread and a note on your phone.

14 — Money
A party's numbers live in five places — the venue's quote, the caterer's per head, the float on the drinks run, what the boat trip takes, a "paid" tick on the guest list — and none of them adds up to the one you want: what is this costing, and how much of it have we actually paid? The budget reads all five and stores only what nobody else knows.


15 — Look & feel
Three ways to dress a party, and one page that offers all three. Your standard theme is the party's own look, composed by the planner and tuned by hand. A pre-built theme is one of thirteen complete worlds, ready to wear. A custom theme is a fourteenth, generated for this party alone. And the designer lays out the pages themselves.


The designer
The guest dashboard, the front door, the join page, the More info page, the RSVP form and the schedule, food, activities, travel and sleeping pages are each a stack of blocks. The designer shows you the real page — at phone, tablet or desk width — and lets you rearrange it where you're looking at it. Nothing changes for your guests until you press Publish.

16 — AI
A planner that sets the party up by asking, two chat bubbles that do the job rather than describing it — one in your console, one on every guest page — and eight more places a model genuinely saves you an evening.
Just say what you want
Yours makes the changes. Theirs answers the questions — and acts on the answer, for the guest asking and nobody else.

Type the instruction and it happens. It reads your parties, your guest lists and what's still outstanding, then makes the change and hands you a link to go and look at it.
The party AI, on the page they're already reading. Someone checking the running order shouldn't have to leave it to ask what time the taxis are.
/whoami tells a guest who
it has them down as, which party it's talking about, and what it can do for them.
And eight more
Behind both the bubble and the full chat page is a persona you write — a text box, not a brand you're stuck with — or one the planner writes for you along with everything else. Name it what you like; guests see that name, and so does the model. No WhatsApp, no number, no setup.
The same job, delivered in the thread people already live in. Tick one box and your party's "ask on WhatsApp" door points at Partyyy's own number, where your party's own assistant — your persona, your name for it — answers. On Telegram too, with a bot of your own. One assistant, one memory, one approval queue behind all three doors, replying on whichever channel the guest wrote in on.
A conversation instead of six settings screens. It asks what the party is, keeps asking until it has fourteen facts, writes each one onto the party as you answer, and then composes the rest in the background: the look, every dashboard string, the emails, the WhatsApp copy, the persona and the info page. Nine hand-written starter looks underneath it for the days you'd rather not.
Inside a pre-built theme the party AI answers under that world's own name and in its own voice — The Barman behind the speakeasy bar, Race Radio at the Tour, Q Branch in the spy thriller — with your party's persona underneath. If the model is unreachable it falls back to a scripted one rather than admitting to an outage.
Every portrait upload is turned into party artwork on two image models, each scene different from every one already made — so no two guests get the same picture — and the face kept recognisably theirs. Group photos are detected and the prompt adapts to keep everyone in frame. A desk of its own lists who's coming with no face yet, renders the lot in one press, and puts every result in a review queue: approve, hide, or refine it from the exact prompt that made it.
Photograph a receipt and send it to your party's assistant on WhatsApp. It reads the shop, the date and every line, files each one against the right line of the budget, and catches the same receipt sent twice.
The designer can lay the guest page out around the party you described, offer you looks as cards to pick from, take "warmer and less shouty" as an instruction, and draft the words for a block — each one a draft you read before anybody sees it.
Poll reminders written from the question itself, so nudging the fourteen people who haven't voted on the dinner time costs one click rather than one paragraph.
Screenshot required
admin-renders.webp
The AI party portraits, which are described above and shown nowhere. This is the most visual feature on the page and the only one selling an image model, so prose alone is the weakest possible case for it. Wanted: a row of finished renders in the album, several guests, visibly different scenes, with the Gemini and Grok chips showing — and ideally one source portrait beside its render.
Not shootable on the demo — it carries no photographs on purpose, and generating faces for fictional people is the wrong trade. Either shoot a consenting real party's album (ralant.party has them) and crop to the artwork, or render a handful from stock portraits on the throwaway rig
Every AI feature is optional and keyed. No key, no feature — the rest of the system is unaffected, and a feature that can't run is hidden rather than offered and then failing. Image generation runs off the request path in a background worker, so an upload never waits on a model.
17 — Platform
yourname.partyyy.party — and you can put it on any of six more of our domains
instead: myrsvp.events, ourwedding.party, lovesto.party,
wantsto.party, fifty.party or forty.party. "Party" is the
wrong word for half the parties on here, and sarahandtom.ourwedding.party is a
link a couple will actually send. Your invitations then send from a matching address, so
guests see one name throughout — and a host can hold more than one address, so a party can
have one of its own.18 — Connect an assistant
Every party site is its own MCP server. Point Claude or ChatGPT at your address and they can read the guest list, move an RSVP, open a market or write your info page — in the app you were already typing into. A hundred and fifty-five tools, and the connection only ever reaches your account.

These take an address and nothing else. Paste yours into Add custom connector, and it sends you back to your own console to approve it with the login you already have — no key to copy, nothing to install. ChatGPT wants developer mode switched on first, then the same address.
Approving issues a key named after that program, so "Claude (connector)" appears on your API keys page and revoking it disconnects that one and nothing else.
Anything that lets you set a header signs in with a key instead of a browser. Issue one on the same page — it's shown once — and the page hands you the command to paste. Same server, same tools, same boundary.
Every connection is read-only or full — picked when you issue the key, or when you approve the connector. A read-only one is only ever offered the tools that read, so it genuinely cannot change your party.
The hundred and fifty-five
Pink ones need a full-access connection; the rest are offered to read-only ones as well. ask_question is pink because it hands the model a question to answer rather than fetching a fixed thing — it still changes nothing.
That's the list
Closed beta — new accounts are let in by hand.